Dry ClO2 gas cycles sterilise isolators in <15 minutes and rooms <2 hours with immediate cycle validation and proof of re-use/re-entry. Unlike other methods, the system can be integrated into facilities or adapted to sterilise multiple isolators/rooms at once within the same time frame, enhancing on the throughput associated with sterilisation in addition to reducing turn around times.